experimental

Entry: run-up height

URI: https://registry.epos-eu.org/ncl/FAIR-Incubator/tcs-TSU/48

The maximum topographic height reached by the tsunami during the inundation phase at the innermost point of inundation.

Core metadata

is a Concept
submitted byTendry R
accepted on 11 Mar 2022 00:16:14.986 | 11 Mar 2022 00:13:52.292

Download formats available

Download formats available

RDF ttl plain with metadata
RDF/XML plain with metadata
JSON-LD plain with metadata
CSV plain with metadata
Export all export

All metadata properties

date accepted 11 Mar 2022 00:16:14.986 | 11 Mar 2022 00:13:52.292
date submitted 11 Mar 2022 00:08:28.254
definition
entity run-up height
source graph graph

description The maximum topographic height reached by the tsunami during the inundation phase at the innermost point of inundation.
item class Concept
label run-up height
notation 48
register tcs tSU
status status experimental
submitter
account name t.randriamalala@externe.brgm.fr
name Tendry R

type register item
version info 3
Pane is loading...
Select tab to expand

Definition

broader run-up
description The maximum topographic height reached by the tsunami during the inundation phase at the innermost point of inundation.
label run-up height
notation 48
related inundation height
type Concept

Links

Has broader concept

Related concept